Creekside Restoration
Project
Background
Watershed Description
Restoration Site Description
Proposed Land Use
Objective
Location
Project Description
Bank Stabilization & Revegetation
Rehabilitation of Riparian Corridor
Permits
Scheduling
Background
Watershed Description
Arana Creek is located within the County of Santa Cruz and partially
within the city limits of the City of Santa Cruz. The watershed drains
a 3.3 square mile drainage and includes approximately six miles of streams.
The watershed drains into the Santa Cruz Small Craft Harbor approximately
1 mile from Monterey Bay. Land ownership within the watershed is approximately
61% private and 29% public. Peak flood discharges for Arana Creek range
from 790 cfs for a 10-year event to 1650 cfs for a 100-year event (FEMA,
1986).
Arana Creek includes the main stem and two unnamed tributaries, which
enter the main stem at approximately 3 miles from the mouth of the creek.
Highway 1 is the major transportation corridor, which divides the watershed.
In the headwaters above Highway 1, Arana Creek is characterized by a
steep, narrow, relatively straight channel, which is deeply incised into
a wide alluvial floodplain and confined by steep bedrock-valley side
slopes. Bed and bank materials are predominantly sand, which is generally
well rooted with riparian vegetation. Relatively little development has
occurred within in the upper reaches of the watershed, but some flood
plain alterations (road fill, drainage improvement, and vegetation removal)
are present. Most of the upper watershed is occupied by mixed willow
or willow-alder riparian forest. Upland tree species, notably coast live
oak and California Bay, are scattered in this forest and are most abundant
around the margins. Tree canopy cover over the creek generally exceeds
80 percent in the upper reaches of the watershed.
The lower portion of the watershed (below Highway 1) has been heavily
urbanized and the stream channel has been altered. Channelization is
common and removal of the riparian zone has occurred in several places.
The lower portion of the watershed is characterized by two place areas
through which the creek travels. These areas are the Santa Cruz Greenbelt
property adjacent to the Santa Cruz Small Craft Harbor and Harbor High
School just upstream of the greenbelt area.
Aquatic species known to be present in the creek
include the steelhead trout and the California Redlegged Frog. Habitat
conditions are also suitable for the Western Pond Turtle. Antidotal
reports of steelhead sitings have been recorded for the creek near
the Harbor High School site and the Greenbelt property during the last
five years. The last recorded spawning by a female steelhead was observed
March 1, 1984 (Titus & Erman,
1993). Limiting factors associated with steelhead decline include riparian
dysfunction including lack of canopy cover and nutrients, excessive sediment
yield resulting from bank instability, and lack of adequate spawning
gravels and resting/pool areas due to siltation. The riparian community
on the project site has been highly impacted by exotics, although communities
of willow-dominant and alder-dominant riparian forest are present as
well as a remnant of oak woodland. A vegetation map created for the project
site identified 42 native species present and 43 exotics present.
Community involvement within the watershed is high. A Coordinated Resources
Management Program, the Arana Gulch Watershed Alliance (AGWA), is active
in the watershed and is assisting in the prioritization of watershed
management planning and restoration. AGWA is submitting a grant application
for preparation of a Watershed Enhancement Plan for Arana Creek. The
Coastal Watershed Council is supportive of this proposal. A volunteer
monitoring program has been ongoing in the watershed since September
1996, managed by the Coastal Watershed Council. Water quality data collected
through the volunteer program demonstrates that water quality is not
the primary limiting factor to salmonid populations. Water quality conditions
are supportive for both spawning and rearing of salmonids, although problems
with temperature and dissolved oxygen levels are present at the Harbor
High School site.
Return to TOP of Page
Restoration Site Description
In June 1997, the Arana Gulch Watershed Alliance established
a volunteer restoration subcommittee to evaluate potential restoration
sites within the watershed. The Coastal Watershed Council was a member
of the committee. Four priority sites were identified by the committee
and ranked according to land ownership, contribution to habitat decline
and potential for funding and/or community involvement. The committee
informally agreed that the first restoration focus would be a site at
Harbor High School.
Over the last several years this area has been experiencing
severe channel cutting and streambank failure due to channelization and
increased flows from impervious surfaces (see photos). The channel is
attempting to increase its width with accelerated erosion. The channel
has become entrenched and is eroding the streambank vertically. The heavy
sediment deposition in this area has resulted in an important loss of
stream habitat in the project site and downstream. A 1993 survey by an
independent fisheries biologist identified this reach of the creek as
having the poorest fish rearing conditions do to lack of in-stream
and canopy cover and sedimentation of the streambed.
Additionally, this section of creek is overrun with nonnative
tree and shrub species which further the instability of the stream banks
and do not provide necessary habitat for associated native avian, fish,
and amphibian species found in the watershed. Over 40 species of exotics
have been identified on the project site. The project site is approximately
350 linear feet and includes both sides of creek for a total project
area of 700 linear feet. Streambank stabilization and revegetation will
occur in an approximate 300-foot section on the southern side of the
bank. Non-natives removal and native replanting will occur in the entire
project area.
The Coastal Watershed Council conducted
a habitat assessment on the 668 foot section of the creek adjacent
to Harbor High School in the summer and fall of 1998 using protocols
from the DFG Restoration Manual. A DFG fisheries biologist assisted
with field observations to ensure quality data. The assessment focused
on stream channel morphology, habitat characteristics, and the presence
of large woody debris. Results showed the channel was rated "B-5" according
to Rosgen stream type classification. There were 21 habitat units identified
within the reach and included 10 pools, 8 glides, and 3 low gradient
riffles. The primary shelter present were undercut banks with root
mass, although some units contained boulders and large/small woody
debris. A lack of large woody debris was also noted due to the dominance
of normative vegetation and lack or recruitment.
A visit by a DFG Fisheries Biologist in August 1998 resulted
in the recommendation that stabilizing the stream bank failure near the
high school and providing increased canopy cover and in-stream cover
and resting areas would be beneficial to efforts to restore the steelhead
population within Arana Creek. Removal of normative species and replacement
by natives will also improve nutrient input into the aquatic system.
Return to TOP of Page
Proposed Land Use
The proposed project is located at Harbor High School
within the Santa Cruz City School District. The project site is currently
a natural area with no plans for construction of any facilities in the
future. An informal pedestrian pathway along the creek will remain following
restoration.
The proposed project is not required as mitigation
in a CEQA approval process, Timber harvest Plan process or otherwise
required as mitigation for other activities.
Return to TOP of Page
Objective
The project will improve instream and upslope habitat for spawning and
rearing steelhead by removing existing sediment sources, providing native
plant cover, and increasing channel capacity for sediment transport. An
eroding streambank will be stabilized and revegetated and existing nonnative
species will be eradicated and replaced by native riparian species.
Return to TOP of
Page
Location
The project site is located in the County of Santa Cruz adjacent to
Soquel Drive and LaFonda Avenue. The project site is located on Santa
Cruz City School District property south of the football field at Harbor
High School. Bank stabilization and revegetation will occur along a 300-foot
linear section of the southern bank of the creek. Nonnative removal will
occur along 700 linear feet of streambank and upland area. See project
maps enclosed.
Return to TOP of Page
Project Description
The project will include:
- Bank stabilization and revegetation along a 300-foot section of the
streambank, and
- Rehabilitation of the riparian corridor with native vegetation.
Return to TOP of Page
1. Bank Stabilization and Revegetation:
The project will involve the grading and re-sloping of 300-feet of the
south bank of the creek to stabilize the existing vertical bank. An estimated
100 cf of material will be removed and disposed of. The bank will be
re-sloped and the toe of the bank will be stabilized with rootwads and
vortex rocks. Brush layering and live post revetments and live cuttings
will then be used to stabilize and re-vegetate the bank slopes. Branch
packing will be used at five sites where slumping/gullying is occurring.
These sites are upstream of the 300-foot section of bank erosion. A consulting
engineer will manage this portion of the project with guidance from the
Executive Director of the Coastal Watershed Council.
Return to TOP of Page
2. Rehabilitation of Riparian Corridor with Native Vegetation
The project will also involve the rehabilitation of the
riparian corridor with native vegetation to increase canopy cover, provide
shade and cover and improve nutrient load to the system. This will be
done on both sides of the streambank and upslope areas for a total of
700 feet. A Revegetation Management Plan has been prepared for the project
site which includes a complete map of all native and nonnative plants,
recommended eradication methods, recommended natives for propagation
and cuttings, and long term weeding and management of planted natives.
Much of this work will be completed with the help of high school students
and community volunteers. A Coastal Watershed Council staff botanist
will manage this portion of the project.
Return to TOP of Page
Permits
It is anticipated that the project will require a DFG 1601/03 Streambed
Alteration Agreement; Landowner Access Agreement; US. Corps of Engineers
404 permit; Regional Water Quality Control Board 401 permit; and California
Environmental Quality Act compliance.
Return to TOP of Page
Scheduling
Work on the project has already begun with regards
to pre-project monitoring, seed collection and native plant propagation
and non-natives removal. The local high school is helping with nonnative
removal and propagation.
Funding for initiating the project has been provided
through a grant provided by the National Fish and Wildlife Foundation
in the amount of $17,000. An additional $7,000 has been raised from involved
agencies and non-profits. In-kind services have been provided by professional
biologists, hydrologists, and engineers. Total amount of match funds
raised for the project is estimated at $40,000.
The proposed schedule for the project is as follows:
-
Bank re-sloping and stabilization - August 1999
-
Removal of non-natives - August - November 1999
-
Revegetation of bank area - October 1999
-
Replanting with natives in bank and upslope areas - October - February
1999/2000
|